FINLAND: ENCOURAGING EXPERIENCES
IN MANPOWER PLANNING
(Published
in The Controller 3/2001)
There´s
no denying the fact that manpower planning is one of the most challenging issues,
no matter whether it´s discussed by the employer or the employees. However,
recent experiences in Finland have produced concrete evidence that there is a
chance of success.
Following
industrial action and recommendations made by outside consultants in spring 1999
a working group was established to assess the optimum number of ATCOs required
per ATS unit. The group consisted of three members nominated by the employer,
CAA, and another three representing FATCA (Finnish Air Traffic Controllers
Association). After 12 months of joint effort the final report of the working
group was published in January 2001.
Outlining the task
In
February-March 1999 inflamed industrial relations culminated in a 5-week
controller strike. In the agreement to close the strike it was included that ”a
working group be established in order to assess the optimum number of ATCOs
required per ATS unit taking into account the need of ATS and the recent and
future development of ATM systems and operational procedures”.
This
task was urged by a parallel working group which had been established to assist
Finnish CAA and FATCA in improving their relations and to study specific
professional problems which had been highlighted during the strike. In their
report a team of occupational, labour market and ATC specialists recommended
that ”the outcome of the assessment and consequent actions be put into
practise without delay”.
When
closing the strike, both parties had committed themselves in a serious effort to
improve the prevailing atmosphere. Thus finding a mutual opinion on the
breakdown of the task was of crucial importance for future proceedings. After
lengthy discussions (seasoned with a pinch of cultivated arm wrestling) it
became clear that concentrating solely on the amount of operational controllers
i.e. the frontline of everyday service provision, would not produce a
satisfactory result, but the secret to success would lie in recognizing the
needs for manpower outside operational quarters, too. Thus, it was agreed that
the assessment be based on three different aspects which finally would provide
the ideal amount of manpower per unit. They were called the Tactical Manpower,
the OPS Core and The Strategic Manpower .
The Tactical Manpower, the OPS Core and
the Strategic Manpower
The
Tactical manpower was defined to be the amount of ATC staff required for the
performance of operational duties each day. It mainly depends on variables such
as services provided, number of sectors and/or positions and work-rest pattern
within shifts. While the Tactical Manpower represents the absolute minimum of
ATCOs, the OPS Core includes an agreed amount of staff (working days) reserved
for vital activities such as continuation and refresher training, OJT,
periodical proficiency and medical checks and absences (sick leaves, maternal/paternal
leaves etc.).
In order to
guarantee further and future needs of the air traffic services such as
management, special tasks, projects in systems and procedures development and
training, a broader approach is required. This is called the Strategic Manpower
which can be provided by evaluating the amount of staff needed for these
activities within a certain period of time. It calls for a closer study of
individual units and their resources, not only quantity- but also qualitywise.
There is no denying the fact that although the Strategic Manpower includes
elements which within certain quarters may be regarded as surplus, it forms the
soundest basis for manpower planning. While ensuring the resources for ongoing,
uninterrupted provision of air traffic services, it also offers the only
alternative for keeping pace with the rapid development of the field.

Modeling the manpower planning process
While
some basic features and parameters of manpower planning may remain the same from
country to country, the majority of the process is likely to be subject to
national or organisational variations. In order to identify the key elements and
the factors affecting the process a model chart was created.
The
model chart is self-explanatory and may vary according to local factors. In this
case the following key elements played a major role:
q
Flight
scheduling and commercial agreements regulating the service hours and services
provided *)
q
Service
hours and staffing of individual positions based on daily shift rotation and
work-rest pattern within shifts
q
Models
of coping with ad hoc situations (occasional sick leaves etc.)
q
Operational
infrastructure: airspace planning, procedures and advances in ATM technology
q
Recognizing
the concept of the Strategic Manpower
*) Note:
in Finland the national carrier and two regional airlines operate according to
three different types of seasonal schedule: the wintertime (”normal”), the
summertime and and the downgraded summertime schedule (summertime low season of
domestic traffic in July)
When
creating the model, the working group performed a study on manpower planning
guidelines provided by Eurocontrol, ICAO and
a series of domestic WG reports which were mutually recognized by both the
employer and the employees.
The Manpower Calculations
In
order to be able to assess the actual optimum number of ATCOs per each unit an
easy-to-use calculation tool was devised. The tool is based on standard Excel
format and offers an opportunity to study the manpower needs through using a
number of variables. Calculation is based on days and shifts with an option for
seasonal corrections.
The
basic data for calculation include an estimate on e.g. the following: number of
operational shifts per day, number of working days to be used for continuation
or refresher training (per person/unit), an average amount of holidays,
sickleave or days off due to personal affairs, an agreed amount of surplus
working days in order to cope with ad hoc situations etc. These parameters are
applied to the whole unit. For calculation purposes the staff is then divided
into two categories, i.e. ATCOs whose input is based on operational work only (ATCO
1) and ATCOs who have supplementary
tasks outside the operational duties, such as management, OJT, special tasks and
projects etc. (ATCO 2). While the input of ATCO 1 controllers is easily
available the input of ATCO 2 controllers remains to be estimated in terms of
working days individually . The formula then provides the total amount of ATCOs
required for the particular unit.
The
formula is not a key to success but offers an efficient planning device once the
parties involved have managed to agree on the actual manpower policy. It´s also
helpful when studying the effects of different options and can be used to
support e.g. annual budgeting.
Conclusions
When
starting the work it was agreed that the time span of the WG´s
assessment would cover a time period of five years. This was to
be supported by
traffic analysis and forecast based on extensive statistics. Later it was
learned that such a long-term assesment would be possible only
within a stable situation or under highly predictable
circimstances. When it comes to major changes in ATM technology
or procedures this may be the case. The effects on manpower
resources are likely to be an essential part of the cost-benefit
analysis of each project. The same, however, does not apply to
commercial airline schedule planning and traffic policy,
especially in a country with marginal market and relatively high
operating costs. Thus the working group could produce a
realistic assessment, based on the prevailing conditions only.
In
terms of concrete staffing figures the result of the WG´s assessment for
Finnish ATC units, management, planning and training indicated a lack of only a
few percent in the prevailing situation. However, there are clear signs of high
pressure being placed on the organization and especially on the national ATC
training institute, Avia College, in the very near future; the number of
retiring ATCOs is about to reach its alltime record this year.
To sum up
Unexpected
changes in airlines´ scheduling and marketing strategies are likely to guide
the airport authorities and service providers in their decisions on the service
hours and services provided (e.g. radar or procedural APP). The employer
continuously consults with the stakeholders, but it´s a forum where the
employees have very little or no say; the law of demand and supply rules - come
what may.
Besides
normal duty rostering each and every unit should have clear, concise
instructions for coping with ad hoc situations. Whether to rely on stand-by
shifts, to downgrade services or to turn to staff performing special duties
outside the operations room depends on the prevailing circumstances, but a
number of "rules of thumb” are required.
It
was mutually agreed that manpower planning be an ongoing process and a vital
part of annual budgeting. Successfull planning is in the interest of both
parties therefore it requires their total commitment to the principles and
procedures. In order to guarantee this the actions recommended by the WG and
taken by the Finnish CAA and FATCA are closely monitored in a joint seminar
every six months.
Finally,
there is no doubt about the fact that no such thing as an absolute, universal
model for manpower planning exists but the process is flexible. Once the key
elements have been identified and mutual
understanding of broad guidelines exists, the actual staff amount calculation
appears to be an easy task. This is where the working group´s
calculation formula proves its efficiency as a versatile supporting
device.
|
ATCO
1
|
|
OPERATIONAL
CONTROLLER, working days per week
|
|
|
Weeks
|
52
|
|
Working
days together
|
|
260
|
|
|
|
minus
public holidays
|
|
|
|
x
|
|
|
|
minus
average sickleaves
|
|
|
x
|
|
|
|
|
|
|
|
total
|
A
|
|
|
Deduction
1
|
|
|
Other
than operational shifts
|
|
|
|
|
|
Training
1
|
|
refresher
training
|
x
|
|
|
|
|
Training
2
|
|
other
local training
|
x
|
|
|
|
|
RTF
|
|
|
|
x
|
|
|
|
|
Other
|
|
|
|
x
|
|
|
|
|
minus
medical and proficiency checks
|
|
x
|
|
|
|
|
|
Working
days together; total
|
B
|
|
|
Deduction
2
|
|
holidays
|
workdays
|
ratio
long/short holid.
|
|
|
|
in Finland
|
long
holidays
45
|
B
- 45
|
0,xx
|
|
(B-45)*0,xx
|
|
|
|
short
holidays
36
|
B
- 36
|
0,yy
|
|
(B-36)*0,yy
|
|
|
|
|
|
|
1,00
|
|
C
|
|
|
|
|
|
|
|
|
|
|
OPERATIONAL
SHIFTS of the ATC unit per year
|
|
|
|
|
|
|
|
|
|
shifts/day
|
days/week
|
weeks
|
|
|
|
weekday
summer season
|
|
0
|
0
|
0
|
D1
|
|
|
saturday
summer season
|
|
0
|
0
|
0
|
D2
|
|
|
Sunday
summer season
|
|
0
|
0
|
0
|
D3
|
|
|
weekday
winter season
|
|
0
|
0
|
0
|
D4
|
|
|
saturday
winter season
|
|
0
|
0
|
0
|
D5
|
|
|
Sunday
winter season
|
|
0
|
0
|
0
|
D6
|
|
|
|
|
|
|
|
TOTAL
|
D
|
|
Addition
1
|
|
Specified
and targeted ATCO training, projects
|
|
|
|
|
|
Local
supervisor training
|
|
|
|
E1
|
|
|
|
Team
training
|
|
|
|
E2
|
|
|
|
Supervisor
course
|
|
|
|
E3
|
|
|
|
ACC/RSR/TAR
course
|
|
|
|
E4
|
|
|
|
SAR
refresher course
|
|
|
|
E5
|
|
|
|
Systems
trainer course
|
|
|
|
E6
|
|
|
|
OJT
training
|
|
|
|
|
E7
|
|
|
|
Army
retraining
|
|
|
|
E8
|
|
|
|
Other
|
|
|
|
|
E9
|
|
|
|
|
|
|
|
TOTAL
|
E
|
|
Addition
2
|
|
Miscellaneous
|
|
|
|
|
|
|
|
Stand-by
shifts per year
|
|
|
F1
|
|
|
|
Maternal/paternal
leave
|
|
|
|
F2
|
|
|
|
Union/association
activities
|
|
|
|
F3
|
|
|
|
Other
|
|
|
|
|
F4
|
|
|
|
|
|
|
|
TOTAL
|
F
|
|
|
|
|
|
|
|
|
|
|
The
number of controllers without additional duties
(ATCO 1)
|
|
|
|
|
Operational
shifts per year
|
|
|
|
D
|
|
|
Addition
1
|
|
|
|
|
|
E
|
|
|
Addition
2
|
|
|
|
|
|
F
|
|
|
|
The
number of shifts per year
|
|
TOTAL
|
G
|
|
|
|
The
number of working days per year
|
|
|
C
|
|
|
|
|
|
|
|
TOTAL
|
G/C
|
|
|
|
|
|
|
|
|
|
|
The
number of operational shifts performed by ATCO 2
|
|
|
|
|
|
Occupation
|
|
|
|
number
of ATCO 2
|
OPS
shifts
|
|
|
Chief
controller
|
|
|
|
H1
|
I1
|
|
|
Deputy
chief controller
|
|
|
|
H2
|
I2
|
|
|
The
chief of search and rescue
|
|
|
H3
|
I3
|
|
|
The
chief of training
|
|
|
|
H4
|
I4
|
|
|
The
chief of OJT
|
|
|
|
H5
|
I5
|
|
|
|
|
|
|
|
|
|
|
|
OJT
instructors, 1-n persons
|
|
|
H7
|
I7
|
|
|
Instructors
in Avia College, 0-n
|
|
|
H8
|
I8
|
|
|
Projects,
0-n
|
|
|
|
|
H9
|
I9
|
|
|
|
|
|
|
|
|
|
|
|
Systems
master operator, 0-n
|
|
|
H11
|
I11
|
|
|
|
|
|
|
|
|
|
|
|
Employee
representative
|
|
|
H13
|
I13
|
|
|
Others,
0-n (varies between the ATC-units)
|
|
H14
|
I14
|
|
|
|
|
|
|
|
TOTAL
H
|
TOTAL
I
|
|
|
|
|
|
|
|
|
|
|
The
OPTIMUM number of ATCOs required (inc. Strategic Manpower)
|
|
|
|
|
Operational
shifts per year
|
|
|
|
D
|
|
|
Addition
1
|
|
|
|
|
|
E
|
|
|
Addition
2
|
|
|
|
|
|
F
|
|
|
Minus
shifts performed by ATCO 2
|
|
|
|
Total
I
|
|
|
|
|
|
|
|
|
TOTAL
J
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The
number of ATCO 1
|
|
|
|
|
Total
J / C
|
|
|
The
number of ATCO 2
|
|
|
|
|
Total
H
|
|
|
|
|
|
|
TOTAL (J/C)+H
|
|